Contractors Who Repaired Morbi Bridge Were Not Qualified, Cable Snapped Due to Weight of New Flooring: Prosecution Tells Court
01/11/2022 1 minute read
Spread the love
While the flooring of the bridge was replaced, its cable was not replaced and it could not take the weight of the changed flooring, said the prosecution, citing a forensic report